top of page
Waukesha Water Utility's Great Lakes Water Supply Program- Waukesha
This project consisted of constructing a pumping station and a 30-inch main that carries drinking water from the City of Milwaukee to the City of Waukesha. This pipeline route stretched 15 miles from 60th Street and Howard Ave in Milwaukee to Racine Ave in New Berlin. It was then connected with Minooka Park's Waukesha Water Utility distribution system. TerraVenture handed four right of way acquisitions for this project. The majority of the route was placed in existing right of way corridors.
Project Gallery
bottom of page